Gullen Range Windfarm
The erection of 23 Suzlon S88 turbines and associated infrastructure for the purpose of creating electricity from wind. The turbine generator components, blades, tower and kiosk transformer were manufactured offsite and transported to the site for the installation and construction of the 80 metre high, steel towers and 88 metre diameter fibreglass rotors. The turbines connect to the electricity network along a combination of underground and overhead cabling via the Capital substation. In addition, new substation equipment installed including transformer, switch room, reactive plant and protection system.
Group DLA were engaged as the appointed Accredited Certifier / Principal Certifying Authority (PCA), responsible for issue of Part 4A Construction and Occupation Certificates over multiple sites.